1TG - Design & Build of the One Tonne Guerilla site navigationSkip to content
  • About.
  • Books.
  • Links.
  • Toyota 1UZ-FE Engine to Audi 012 Transmission (Porsche G86) Adapter Drawings.
Search

1TG - Design & Build of the One Tonne Guerilla

The Design & Build Diary of the One Tonne Guerilla.

Author: Doug

January 15, 2021.  More electrics and some fiberglass.

January 15, 2021. More electrics and some fiberglass.

Relays. With the mechanical’s of the drive train virtually complete the wiring had to be worked on next. The first…

Continue reading "January 15, 2021. More electrics and some fiberglass."…
15 Jan 2021 Comments: 0
December 26, 2020. Drive shafts.

December 26, 2020. Drive shafts.

In a change from working on electrics, the axles for the drive shafts arrived in the mail, so I decided…

Continue reading "December 26, 2020. Drive shafts."…
26 Dec 2020 Comments: 0
December 15, 2020.

December 15, 2020.

A job done some time ago but not shown, was to make bump stops for the suspension units. As supplied…

Continue reading "December 15, 2020."…
15 Dec 2020 Comments: 0
November 21, 2020

November 21, 2020

Carrying on from the last post, to finish the fuel system there were some final parts to assemble and others…

Continue reading "November 21, 2020"…
21 Nov 2020 Comments: 0
November 7, 2020.  Cooling system.

November 7, 2020. Cooling system.

I’ve been taking a break from the wiring to focus on the cooling system of the engine. The original connections…

Continue reading "November 7, 2020. Cooling system."…
7 Nov 2020 Comments: 0
October 30, 2020.

October 30, 2020.

Carrying on from the last post more wiring was needed for the engine, the wiring on the engine I’ve broken…

Continue reading "October 30, 2020."…
30 Oct 2020 Comments: 0
October 14, 2020

October 14, 2020

The 3D print of the air filter connection again failed, though it did look pretty. The part still split and…

Continue reading "October 14, 2020"…
14 Oct 2020 Comments: 0
October 9, 2020.

October 9, 2020.

I’ve been told that the page with the transmission adapter drawings was not working correctly, so this has been fixed,…

Continue reading "October 9, 2020."…
9 Oct 2020 Comments: 0
September 10, 2020

September 10, 2020

A couple more bits completed by the welder. First the water pump inlet, prototype next to the finished thing… I’m…

Continue reading "September 10, 2020"…
10 Sep 2020 Comments: 0
August 30, 2020.

August 30, 2020.

Carrying on from the previous post, to measure the movement needed to get the clutch to work, I sourced a…

Continue reading "August 30, 2020."…
30 Aug 2020 Comments: 0
1 2 3 … 12 »
© 2021 1TG - Design & Build of the One Tonne Guerilla. Powered by WordPress. Theme by WebMan Design. Back to top ↑