Before leaving home for the week, I had a chance to fit a few more tubes in at the rear…
Friday October 26, 2007.
As it’s been a month since my last post it’s about time I updated where I am… Firstly not much…
Sunday September 23rd 2007.
Some more progress to report… Basically more tubes tacked in, now the top side rails are done I think that…
Wednesday 12th September 2007.
Here’s the week’s progress… Doesn’t look like much but getting the side top rail fitted took several hours on its…
Monday September 3, 2007.
A bit of progress has been made tacking on some of the frame, at this stage fitting each tube seams…
Monday August 20, 2007.
Lots of welding has been done since the last post with not really much to show for it. The floor…
Tuesday July 31, 2007.
The floor has now been tacked together and then fully welded on 3 sides of the tube joints, the vertical…
Monday July 23, 2007.
The frame build has now moved onto the floor, the picture below shows the results of time grabbed over the…
Wednesday July 18, 2007.
So I finally got the gearbox home today, it’s taken 8 months since it was bought on eBay in the…
Monday July 16, 2007.
Having been away on another work trip for a couple of weeks, progress has again slowed. Since my return I’ve…