June 23, 2020. Engine re-assembly Part 1.

June 23, 2020. Engine re-assembly Part 1.

further major work on the engine had been stalled waiting on parts to turn up from Summit Racing which (a…

Continue reading "June 23, 2020. Engine re-assembly Part 1."…
23 Jun 2020 Comments: 0
June 21, 2020

June 21, 2020

Continuing with the 3D printing, this time in PLA I produced the prototype for the exit ducting for the radiators.…

Continue reading "June 21, 2020"…
22 Jun 2020 Comments: 0
June 20, 2020

June 20, 2020

Carrying on from the last post, this is the radiator to floor brace welded up and bolted in place. And…

Continue reading "June 20, 2020"…
21 Jun 2020 Comments: 0
April 17, 2020. Progress.

April 17, 2020. Progress.

Progress on the engine has stopped whilst I wait for parts to arrive. So the focus switched to other parts…

Continue reading "April 17, 2020. Progress."…
17 Apr 2020 Comments: 0
March 24, 2020.  Engine Service.

March 24, 2020. Engine Service.

With the engine now on a stand I could take it apart for inspection and cleaning. The engine has not…

Continue reading "March 24, 2020. Engine Service."…
24 Mar 2020 Comments: 0
March 19, 2020 Photogrammetry.

March 19, 2020 Photogrammetry.

With the engine out of the car for transport I took the opportunity to try photogrammetry on it. Engines being…

Continue reading "March 19, 2020 Photogrammetry."…
19 Mar 2020 Comments: 0
March 19, 2020. Catch up Part 3, The Move.

March 19, 2020. Catch up Part 3, The Move.

During December 2019 my assignment in Darwin came to an end, and we were to relocate to Perth, WA. Due…

Continue reading "March 19, 2020. Catch up Part 3, The Move."…
19 Mar 2020 Comments: 0
March 19, 2020.  Catch up Part 2

March 19, 2020. Catch up Part 2

Work was started on the fuel lines, the intention is to use hard line wherever possible and only use hose…

Continue reading "March 19, 2020. Catch up Part 2"…
19 Mar 2020 Comments: 0
March 03, 2020. Catch up Part 01

March 03, 2020. Catch up Part 01

Its been a long time since the last update, so here goes, this ma take more than one post. From…

Continue reading "March 03, 2020. Catch up Part 01"…
3 Mar 2020 Comments: 0
May 09, 2019.

May 09, 2019.

From the last post I’d folded the passenger side cover for the side box. however in the process of finishing…

Continue reading "May 09, 2019."…
10 May 2019 Comments: 0