1TG – Design & Build of the One Tonne Guerilla

The Design & Build Diary of the One Tonne Guerilla.

Category: Project Status (page 9)

Thursday September 11, 2008.

A bit more work has been done since the last post, mainly the radiator support has been fixed in place……
Continue reading “Thursday September 11, 2008.”…
Posted on: September 11, 2008 Last updated on: September 11, 2008 Written by: Doug

Wednesday September 2, 20008.

Since the last post I’ve finished off the suspension brackets and welded them onto the frame. In a couple of…
Continue reading “Wednesday September 2, 20008.”…
Posted on: September 2, 2008 Last updated on: September 2, 2008 Written by: Doug

Sunday August 17, 2008.

Suspension Brackets: Measuring & Fabrication.   OK so the next job that’s needed doing is the attachment of the suspension…
Continue reading “Sunday August 17, 2008.”…
Posted on: August 17, 2008 Last updated on: August 17, 2008 Written by: Doug

Friday July 18, 2008.

It’s been a long time since the last post, there has been things happening with the car, more with sourcing…
Continue reading “Friday July 18, 2008.”…
Posted on: July 18, 2008 Last updated on: July 18, 2008 Written by: Doug

Monday 14th April, 2008.

Since the last post I’ve engaged an Engineer to review the car, he’s been and inspected the progress to date…
Continue reading “Monday 14th April, 2008.”…
Posted on: April 14, 2008 Last updated on: April 14, 2008 Written by: Doug

Thursday November 1, 2007.

Before leaving home for the week, I had a chance to fit a few more tubes in at the rear…
Continue reading “Thursday November 1, 2007.”…
Posted on: November 1, 2007 Last updated on: November 1, 2007 Written by: Doug

Friday October 26, 2007.

As it’s been a month since my last post it’s about time I updated where I am… Firstly not much…
Continue reading “Friday October 26, 2007.”…
Posted on: October 26, 2007 Last updated on: October 26, 2007 Written by: Doug

Sunday September 23rd 2007.

Some more progress to report… Basically more tubes tacked in, now the top side rails are done I think that…
Continue reading “Sunday September 23rd 2007.”…
Posted on: September 23, 2007 Last updated on: September 23, 2007 Written by: Doug

Wednesday 12th September 2007.

Here’s the week’s progress… Doesn’t look like much but getting the side top rail fitted took several hours on its…
Continue reading “Wednesday 12th September 2007.”…
Posted on: September 12, 2007 Last updated on: September 12, 2007 Written by: Doug

Monday August 20, 2007.

Lots of welding has been done since the last post with not really much to show for it. The floor…
Continue reading “Monday August 20, 2007.”…
Posted on: August 20, 2007 Last updated on: August 20, 2007 Written by: Doug