• Skip to main navigation
  • Skip to main content
  • Skip to footer

1TG – Design & Build of the One Tonne Guerilla

The Design & Build Diary of the One Tonne Guerilla.

Wednesday 12th September 2007.

Posted on: September 12, 2007 Last updated on: September 12, 2007 Categorized in: Project Status Written by: Doug

Here’s the week’s progress…

Doesn’t look like much but getting the side top rail fitted took several hours on its own.

Skip back to main navigation

Post navigation

Previous Post Monday September 3, 2007.
Next Post Sunday September 23rd 2007.
© 2026 1TG – Design & Build of the One Tonne Guerilla | Using Modern WordPress theme. | Back to top ↑