• Skip to main navigation
  • Skip to main content
  • Skip to footer

1TG – Design & Build of the One Tonne Guerilla

The Design & Build Diary of the One Tonne Guerilla.

Month: April 2008

Sunday April 26, 2008.

The pictures below show the pedal box and bottom steering column mounting taking shape and mounted, as you can see…
Continue reading “Sunday April 26, 2008.”…
Posted on: April 26, 2008 Last updated on: April 26, 2008 Written by: Doug

Monday 14th April, 2008. Surfacing – Rendering

a design aspect I’ve been working on a bit lately is the bodywork. This is  proving troublesome as I am…
Continue reading “Monday 14th April, 2008. Surfacing – Rendering”…
Posted on: April 14, 2008 Last updated on: April 14, 2008 Written by: Doug

Monday 14th April, 2008.

Since the last post I’ve engaged an Engineer to review the car, he’s been and inspected the progress to date…
Continue reading “Monday 14th April, 2008.”…
Posted on: April 14, 2008 Last updated on: April 14, 2008 Written by: Doug
© 2026 1TG – Design & Build of the One Tonne Guerilla | Using Modern WordPress theme. | Back to top ↑