• Skip to main navigation
  • Skip to main content
  • Skip to footer

1TG – Design & Build of the One Tonne Guerilla

The Design & Build Diary of the One Tonne Guerilla.

December 14, 2011.

December 14, 2011.

Posted on: December 14, 2011 Last updated on: April 2, 2016 Categorized in: Project Status Written by: Doug

Here is the chassis frame back from being sand blasted and primed. Since these were taken it’s had a coat of KBS Rust Seal and I’m now in the process of building the whole thing back up so it can go in to storage, more pics soon.

 

 

Skip back to main navigation

Post navigation

Previous Post November 10, 2011.
Next Post December 17, 2011.
© 2025 1TG – Design & Build of the One Tonne Guerilla | Using Modern WordPress theme. | Back to top ↑