Monday September 3, 2007.
A bit of progress has been made tacking on some of the frame, at this stage fitting each tube seams to involve endless repeated measurement to keep everything square and correct. As expected now I’m not working on the flat plane of the table things are more difficult. hopefully once the major tubes are located filling in the rest will be a lot quicker.
Also the brakes have been sourced a complete 4 wheel kit for a Corvette Z06 which look like:
The pictures may make the frame look taller than it really is, from the top of the table to the top of the roll frame is 975mm