Sunday September 23rd 2007. Some more progress to report… Basically more tubes tacked in, now the top side rails are done I think that… Continue reading “Sunday September 23rd 2007.”…
Wednesday 12th September 2007. Here’s the week’s progress… Doesn’t look like much but getting the side top rail fitted took several hours on its… Continue reading “Wednesday 12th September 2007.”…
Monday September 3, 2007. A bit of progress has been made tacking on some of the frame, at this stage fitting each tube seams… Continue reading “Monday September 3, 2007.”…
Monday August 20, 2007. Lots of welding has been done since the last post with not really much to show for it. The floor… Continue reading “Monday August 20, 2007.”…
Tuesday July 31, 2007. The floor has now been tacked together and then fully welded on 3 sides of the tube joints, the vertical… Continue reading “Tuesday July 31, 2007.”…
Monday July 23, 2007. The frame build has now moved onto the floor, the picture below shows the results of time grabbed over the… Continue reading “Monday July 23, 2007.”…
Wednesday July 18, 2007. So I finally got the gearbox home today, it’s taken 8 months since it was bought on eBay in the… Continue reading “Wednesday July 18, 2007.”…
Monday July 16, 2007. Having been away on another work trip for a couple of weeks, progress has again slowed. Since my return I’ve… Continue reading “Monday July 16, 2007.”…
Sunday June 24, 2007. Due to some extended time away from home It’s been quite some time since I’ve had anything to post here,… Continue reading “Sunday June 24, 2007.”…
Monday May 07, 2007. Finally got around to catching the frame stress analysis model up to where the design model is this evening. The… Continue reading “Monday May 07, 2007.”…