7 November, 2021. Making random parts and the brakes better.

7 November, 2021. Making random parts and the brakes better.

Leaks no more. Part of the previous exercises in messing with the engine was to stress test the cooling system…
Continue reading “7 November, 2021. Making random parts and the brakes better.”…
Posted on: November 8, 2021 Last updated on: November 8, 2021 Written by: Doug
September 20, 2021.  MPCNC Machining, 3D Printing and Wiring.

September 20, 2021. MPCNC Machining, 3D Printing and Wiring.

Again long time not update, the main focus I’ve had is to get the car ready to go to the…
Continue reading “September 20, 2021. MPCNC Machining, 3D Printing and Wiring.”…
Posted on: September 20, 2021 Last updated on: September 20, 2021 Written by: Doug
January 15, 2021.  More electrics and some fiberglass.

January 15, 2021. More electrics and some fiberglass.

Relays. With the mechanical’s of the drive train virtually complete the wiring had to be worked on next. The first…
Continue reading “January 15, 2021. More electrics and some fiberglass.”…
Posted on: January 15, 2021 Last updated on: January 15, 2021 Written by: Doug
December 15, 2020.

December 15, 2020.

A job done some time ago but not shown, was to make bump stops for the suspension units. As supplied…
Continue reading “December 15, 2020.”…
Posted on: December 15, 2020 Last updated on: December 15, 2020 Written by: Doug
November 21, 2020

November 21, 2020

Carrying on from the last post, to finish the fuel system there were some final parts to assemble and others…
Continue reading “November 21, 2020”…
Posted on: November 21, 2020 Last updated on: November 21, 2020 Written by: Doug
November 7, 2020.  Cooling system.

November 7, 2020. Cooling system.

I’ve been taking a break from the wiring to focus on the cooling system of the engine. The original connections…
Continue reading “November 7, 2020. Cooling system.”…
Posted on: November 7, 2020 Last updated on: November 7, 2020 Written by: Doug
October 30, 2020.

October 30, 2020.

Carrying on from the last post more wiring was needed for the engine, the wiring on the engine I’ve broken…
Continue reading “October 30, 2020.”…
Posted on: October 30, 2020 Last updated on: October 30, 2020 Written by: Doug
October 9, 2020.

October 9, 2020.

I’ve been told that the page with the transmission adapter drawings was not working correctly, so this has been fixed,…
Continue reading “October 9, 2020.”…
Posted on: October 9, 2020 Last updated on: October 9, 2020 Written by: Doug
July 20, 2020.

July 20, 2020.

After some aborted attempts I produced the first real part from the MPCNC. This is one of the plates that…
Continue reading “July 20, 2020.”…
Posted on: July 20, 2020 Last updated on: July 20, 2020 Written by: Doug
July 5, 2020.

July 5, 2020.

I’d really wanted to get the cam covers stove enameled, that turned out too hard to do in the current…
Continue reading “July 5, 2020.”…
Posted on: July 6, 2020 Last updated on: July 6, 2020 Written by: Doug